Est. 1973

The Indian government has set very high targets for the power sector in the 13th five-year plan, besides trying to achieve the target set for the 12th five-year plan. Consequently, the transmission network will have to match the installed power generation capacity. But while there has been an increase in demand for Electrical Power Generation & Transmission, there exist a few hindrances, which include:

 

  • High cost to install new Power lines

  • Difficulty in acquiring Tower sites

  • Right of way (ROW)

  • Time involved in constructing new Power lines

  • Provision for future contingencies

logo2.png
6.png
asa.png

Est. 1973

  • YouTube|Shashi Cables Ltd.
  • Home

  • About Us

    • Who we Are
    • Our Vision
    • Gallery
    • Our Clients
  • Products

    • AAA Conductor
    • AA Conductor
    • ACSR Conductor
    • ACAR Conductor
    • GAP Conductor
    • HTLS Conductor
    • CONTACT WIRE
  • Quality

    • Certifications
  • Careers

    • Drop Your CV
    • New Openinigs
  • Contact

  • More

    Use tab to navigate through the menu items.
    • LinkedIn
    • Facebook
    • Twitter
    DE
    DE
    EN
    ZH
    to2.png

    All © 2021 Shashi Cables Limited. 

    Privacy Policy
    Terms & Conditions

    Home           About Us            Products                   Quality               Careers

                        Who we are            AAA Conductor              Certifications          Drop Your CV

                            Our Vision             AA Conductor                                               New Openings

                            Gallery                   ACSR Conductor

                            Our Clients            ACAR Conductor

                                                          GAP Conductor

                                                          HTLS Conductor

                                                          Contact Wire(HDGC)

    • LinkedIn
    • Facebook
    • Twitter
    • YouTube|Shashi Cables Ltd.